    Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-s...

  • S1E4 Transforming the Property

    A couple embarks on a renovation journey in Wales, tackling challenges like weather and a large stump. They build a rain shelter and parking bay while enhancing their garden. As they gather materials and discuss future projects, they explore a barn, assessing its potential. The week ends on a pos...

  • S2E8 Backfilling, Leveling, and Compa...

    The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...