S1E14 Bathroom Renovation Update: Progress and Challenges
New Episodes
•
TV-PG
Work on the bathroom continues with wall preparation and plumbing layout. The team encounters challenges related to waste management and flooring choices. Electrical work starts in the en suite, but progress is hindered by illness. Viewer feedback on flooring options is sought, highlighting the significance of audience input in the renovation process.
Up Next in New Episodes
-
S3E16 Before Punch List
The punch list process brings together designers and architects to finalize project details ahead of client review. Key elements include a completed mantle and soapstone installation, with a focus on paint touch-ups. The kitchen features a U-shaped layout for maximum storage and custom cabinetry....
-
S1E15 Framing the Second Floor (Global)
-
S2E23 Underground Electric | Trenchin...
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...