S1E14 Bathroom Renovation Update: Progress and Challenges
New Episodes
•
21m
Work on the bathroom continues with wall preparation and plumbing layout. The team encounters challenges related to waste management and flooring choices. Electrical work starts in the en suite, but progress is hindered by illness. Viewer feedback on flooring options is sought, highlighting the significance of audience input in the renovation process.
Up Next in New Episodes
-
S2E18 Framing the Floor with I-Joists
Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-s...
-
S1E4 Transforming the Property
A couple embarks on a renovation journey in Wales, tackling challenges like weather and a large stump. They build a rain shelter and parking bay while enhancing their garden. As they gather materials and discuss future projects, they explore a barn, assessing its potential. The week ends on a pos...
-
S2E8 Backfilling, Leveling, and Compa...
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...