S2E23 Underground Electric | Trenching the FINAL 230ft
New Episodes
•
TV-PG
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost line depth. Dry weather affects the digging, and heavy equipment brings back childhood memories. The trench is backfilled with stone dust, and the project awaits the utility company for installation.
Up Next in New Episodes
-
S1E18 Repairing Rotten Joists and Pre...
Structural repairs take priority as Gavin and Nicole tackle rotten joists, replacing damaged sections with new timbers and treating exposed wood with borax gel for long-term protection. Layers of old paint are stripped back from beams and carefully neutralized, preparing the walls for breathable ...
-
S1E15 Plywood edge doors?
The shop is working on projects for HUD care architects, focusing on material selections to meet client expectations. They discuss constructing doors with ash veneer and plywood edges, sourcing poplar veneer core, and the challenges of large plywood doors. Techniques for applying veneers and cabi...
-
S1 E8 Recreating the English Tavern
Bren Bicho Tavern transforms from a crawl space into a beautifully designed English room. The design process tackles challenges like excavation and lighting, featuring a paneled wall with historical significance and unique carving techniques. Attention to proportions and hidden mechanical element...