S3E16 Before Punch List
New Episodes
•
TV-PG
The punch list process brings together designers and architects to finalize project details ahead of client review. Key elements include a completed mantle and soapstone installation, with a focus on paint touch-ups. The kitchen features a U-shaped layout for maximum storage and custom cabinetry. Lighting installations are trimless, needing adjustments for performance. Functional storage is provided through door designs and cabinetry, while outdoor developments include a roof deck and radiant heat for winter use.
Up Next in New Episodes
-
S1E15 Framing the Second Floor (Global)
-
S2E23 Underground Electric | Trenchin...
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...
-
S2E19 Structural Ridge Beam Installation
The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installe...