S1E15 Framing the Second Floor (Global)
New Episodes
•
11m
Up Next in New Episodes
-
S2E23 Underground Electric | Trenchin...
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...
-
S2E19 Structural Ridge Beam Installation
The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installe...
-
S2E20 Do You Know What This 19th Cent...
The tasks include preparing flooring, fixing wood damage, and cleaning the garden. Challenges arise from old materials, such as missing pieces and woodworm. Garden maintenance focuses on ivy removal and wall repairs. An exploration of an old farmhouse reveals its structural elements and potential...