Foundation construction begins with determining the height based on the water table and ensuring proper elevation. Significant volumes of concrete walls are placed, with anchor bolts installed every 32 inches for added stability. A brick shelf is included for aesthetic continuity and effective drainage. Upcoming tasks involve waterproofing and preparing for framing to ensure smooth project progression.
Up Next in Season 1
-
S1E9 Insulating the Slab
Foundation installation is complete, and slab preparation is in progress. Selected waterproofing products will enhance the warranty. Structural foam fill is used for insulation and support under the slab, which has varying thicknesses. An ejector pump is installed for the basement bathroom, and r...
-
S1E10 New Driveway Begins
The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...
-
S1E11 Finding the Control Lines
Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separ...