Foundation installation is complete, and slab preparation is in progress. Selected waterproofing products will enhance the warranty. Structural foam fill is used for insulation and support under the slab, which has varying thicknesses. An ejector pump is installed for the basement bathroom, and rough plumbing is set up. A future vent drain is added, and a stairwell is built for access. Framing preparations are underway, scheduled to start in three weeks.
Up Next in Season 1
-
S1E10 New Driveway Begins
The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...
-
S1E11 Finding the Control Lines
Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separ...
-
S1E12 Site-building Our Roof Trusses
The team focuses on constructing gable walls and trusses for the roof in Needham. They decide to prefabricate trusses on-site for a proper fit. Emphasis is placed on the importance of wall and roof structure, ensuring parallel walls and correct floor placement. Ventilation strategies are outlined...