The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot is shaped for future development. Framers are set to arrive next week, building excitement for the next phase.
Up Next in Season 1
-
S1E11 Finding the Control Lines
Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separ...
-
S1E12 Site-building Our Roof Trusses
The team focuses on constructing gable walls and trusses for the roof in Needham. They decide to prefabricate trusses on-site for a proper fit. Emphasis is placed on the importance of wall and roof structure, ensuring parallel walls and correct floor placement. Ventilation strategies are outlined...
-
S1E13 Framing with KD vs Engineered L...
Explore the key aspects of construction in Needham, focusing on roof and wall framing. The assembly of trusses and effective ventilation strategies are discussed, highlighting the decision to avoid spray foam for better air tightness. The framing of a two-story wall is examined, emphasizing mater...