S1E10 New Driveway Begins

5m 0s

Up Next in Season 1

  • S1E11 Finding the Control Lines

    Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separ...

  • S1E12 Site-building Our Roof Trusses

    The team focuses on constructing gable walls and trusses for the roof in Needham. They decide to prefabricate trusses on-site for a proper fit. Emphasis is placed on the importance of wall and roof structure, ensuring parallel walls and correct floor placement. Ventilation strategies are outlined...

  • S1E13 Framing with KD vs Engineered L...

    Explore the key aspects of construction in Needham, focusing on roof and wall framing. The assembly of trusses and effective ventilation strategies are discussed, highlighting the decision to avoid spray foam for better air tightness. The framing of a two-story wall is examined, emphasizing mater...