Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separate system with a filter fabric and access manhole. Next, the first floor framing will be installed, including structural materials and subflooring.
Up Next in Season 1
-
S1E12 Site-building Our Roof Trusses
The team focuses on constructing gable walls and trusses for the roof in Needham. They decide to prefabricate trusses on-site for a proper fit. Emphasis is placed on the importance of wall and roof structure, ensuring parallel walls and correct floor placement. Ventilation strategies are outlined...
-
S1E13 Framing with KD vs Engineered L...
Explore the key aspects of construction in Needham, focusing on roof and wall framing. The assembly of trusses and effective ventilation strategies are discussed, highlighting the decision to avoid spray foam for better air tightness. The framing of a two-story wall is examined, emphasizing mater...
-
S1E14 Understanding Structural Detail...
The project introduces structural detail walls, defining shear walls and their role in construction. It discusses the first floor layout, including design surprises and wall framing details with plywood for strength. The installation of a continuous vapor retarder is highlighted for improved perf...