The project introduces structural detail walls, defining shear walls and their role in construction. It discusses the first floor layout, including design surprises and wall framing details with plywood for strength. The installation of a continuous vapor retarder is highlighted for improved performance. The importance of an airtight home for climate control is addressed, along with the kitchen and living space layout. Updates on the second floor system and construction progress are also shared.
Up Next in Season 1
-
S1E15 Framing the Second Floor
Explore the essential elements of home construction, starting with mockups and framing details. Key materials like brick and shiplap are highlighted, along with the significance of mockups for client choices. The use of I joists and shear walls ensures structural integrity in floor framing. Stair...
-
S1E16 Complicated Roof Framing
The construction project at the teak design group showcases the introduction of Julian Miller and the transformation of the backyard. It highlights prefabrication for roof framing, material reuse strategies, and the complexity of roof design. Key updates include the design of staircases, window p...
-
S1E17 Building a Swooping Roof
Teak Design Group demonstrates a unique roof construction process that includes site-built trusses and intricate architectural details. Curved roofs require larger lumber, leading to increased costs. The attic structure showcases the connections between rafters and LVLs, highlighting design compl...