The construction project at the teak design group showcases the introduction of Julian Miller and the transformation of the backyard. It highlights prefabrication for roof framing, material reuse strategies, and the complexity of roof design. Key updates include the design of staircases, window placement issues, and the use of a temporary platform for safety. Plans for roof fabrication, a weather barrier installation, and job site hygiene facilities are also discussed.
Up Next in Season 1
-
S1E17 Building a Swooping Roof
Teak Design Group demonstrates a unique roof construction process that includes site-built trusses and intricate architectural details. Curved roofs require larger lumber, leading to increased costs. The attic structure showcases the connections between rafters and LVLs, highlighting design compl...
-
S1E18 Sheathing the Swooping Roof
The project focuses on sheathing and WRB installation using self-adhered materials. Roof construction is progressing with careful framing and material selection. On-site trusses ensure proper support. The garage is prepared for concrete with moisture control. Interior walls are being built with a...
-
S1E19 Open Living Room Concept
The update highlights the advancements in the Steve Teak project and Cassie Garner Interiors, focusing on the design of the homework loft and its connection to the main house. It covers roof framing techniques, interior design adjustments, and the introduction of a future laundry room. The kitche...