The project focuses on sheathing and WRB installation using self-adhered materials. Roof construction is progressing with careful framing and material selection. On-site trusses ensure proper support. The garage is prepared for concrete with moisture control. Interior walls are being built with attention to layouts, including a unique homework loft connecting the main house. Future masonry will incorporate reclaimed brick for added character and strength.
Up Next in Season 1
-
S1E19 Open Living Room Concept
The update highlights the advancements in the Steve Teak project and Cassie Garner Interiors, focusing on the design of the homework loft and its connection to the main house. It covers roof framing techniques, interior design adjustments, and the introduction of a future laundry room. The kitche...
-
S1E20 Architectural Designer & Builde...
A collaboration unfolds between a design team and a homeowner, drawing inspiration from European cottages and Tudor architecture. The team conducts a site walk, focusing on design challenges related to light and space. They perform sun studies to optimize natural light and discuss interior elemen...
-
S1E21 Window Installation
Significant progress is made on the roof installation, with the roof framing completed and window installations underway. The team focuses on selecting synthetic slate materials for an authentic look and addresses the complexities of curved valleys. Proper framing and drainage are emphasized in t...