The site visit in Needham focuses on key construction topics such as concrete footings, waterproofing techniques, and rebar importance. Methods to prevent capillary action and manage water intrusion are discussed, along with cold joint management for structural integrity. The team outlines a phased strategy for pouring the foundation and addresses project complexities. Upcoming steps include wall placements and a scheduled foundation pour to ensure smooth project progression.
Up Next in Season 1
-
S1E8 Insulating the Foundation
Foundation construction begins with determining the height based on the water table and ensuring proper elevation. Significant volumes of concrete walls are placed, with anchor bolts installed every 32 inches for added stability. A brick shelf is included for aesthetic continuity and effective dr...
-
S1E9 Insulating the Slab
Foundation installation is complete, and slab preparation is in progress. Selected waterproofing products will enhance the warranty. Structural foam fill is used for insulation and support under the slab, which has varying thicknesses. An ejector pump is installed for the basement bathroom, and r...
-
S1E10 New Driveway Begins
The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...