Construction is advancing with the placement of concrete for phase one footings and the installation of vertical rebar. Three concrete trucks and a pump are on site. Preparations for waterproofing and drainage systems are underway. A meeting with Seagate addresses air sealing strategies and design complexities. Excavation plans for the front entryway and garage ensure waterproofing for the main house foundation. Weather impacts construction, with insulated blankets protecting the concrete.
Up Next in Season 1
-
S1E7 Rebar Ready
The site visit in Needham focuses on key construction topics such as concrete footings, waterproofing techniques, and rebar importance. Methods to prevent capillary action and manage water intrusion are discussed, along with cold joint management for structural integrity. The team outlines a phas...
-
S1E8 Insulating the Foundation
Foundation construction begins with determining the height based on the water table and ensuring proper elevation. Significant volumes of concrete walls are placed, with anchor bolts installed every 32 inches for added stability. A brick shelf is included for aesthetic continuity and effective dr...
-
S1E9 Insulating the Slab
Foundation installation is complete, and slab preparation is in progress. Selected waterproofing products will enhance the warranty. Structural foam fill is used for insulation and support under the slab, which has varying thicknesses. An ejector pump is installed for the basement bathroom, and r...