S2E5 Keeping Steam Radiators
Trending Episodes
•
16m
The Back Bay project focuses on essential updates and reframing efforts. It addresses flooring adjustments by identifying high and low spots, tackling patchwork and leveling challenges. Staircase leveling is vital for even risers, and self-leveling options are considered. The project also discusses the steam heating system for efficiency and shared costs, while optimizing HVAC unit placement for ceiling height and maintenance access.
Up Next in Trending Episodes
-
S3E1 Hammering Through 12 Feet Of Ledge
The project showcases 45 white oak residents and emphasizes redefining builder grade through site work. It discusses the demolition of an existing home, collaboration with the fire department, and challenges from site elevation and ledge. Excavation impacts costs but reinforces design commitment....
-
S2E10 Cleaning the Chateau with Tooth...
Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...
-
S1E3 What is Colonial Revival Archite...
Colonial Revival architecture, inspired by the colonial period from 1890 to 1940, showcases key styles like Georgian, Federal, and Greek Revival. Accurate architectural details, such as moldings and door casings, are essential for authenticity. The historical use of shutters and their design, alo...