Live stream preview

Next video will start in 30 seconds

S2E19 Structural Ridge Beam Installation

Close Open

S4E15 Remodeling our New Build.. Already?

Trending Episodes • 31m

Up Next in Trending Episodes

  • S2E19 Structural Ridge Beam Installation

    The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installe...

  • S2E10 Cleaning the Chateau with Tooth...

    Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...

  • S2E12 Surprise Delivery from Canada!

    The renovation process includes installing lighting and managing steam in bathrooms. The project focuses on updating the ceiling and flooring, with plans to paint radiators for a cohesive look. Challenges arise with wallpapering due to low materials. A subscriber sends a thoughtful gift, providin...