S2E23 Underground Electric | Trenching the FINAL 230ft
Trending Episodes
•
17m
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost line depth. Dry weather affects the digging, and heavy equipment brings back childhood memories. The trench is backfilled with stone dust, and the project awaits the utility company for installation.
Up Next in Trending Episodes
-
S3E1 Main Electrical Service Panel In...
A rainy day sets the stage for installing a 200 amp main electric service panel. The process includes setting up the panel, installing conduit, and following NEC code for guidance. A heat gun bends the conduit, and ground wire is connected. Wiring connections are made, including neutral and hot w...
-
S3E12 Pouring a Small Concrete Slab f...
The project starts with installing an HVAC system for both upstairs and downstairs. A concrete slab is prepared for outdoor units, with careful attention to dimensions and securing methods. A concrete mixer is used to achieve the right consistency for the pour. Challenges during pouring include t...
-
S3E14 Installing a Very Efficient Duc...
The installation of the Mr Cool Universal System, a ducted split heat pump, starts with planning the duct work and line sets using specialized software. Concrete pads are prepared for stability, and the air handler's build quality is highlighted for its efficiency. Insulation materials are discus...