S2E23 Underground Electric | Trenching the FINAL 230ft
Trending Episodes
•
17m
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost line depth. Dry weather affects the digging, and heavy equipment brings back childhood memories. The trench is backfilled with stone dust, and the project awaits the utility company for installation.
Up Next in Trending Episodes
-
S3E21 Journey of Restoration and Crea...
Feeling out of breath, the speaker reflects on their long journey to a space they dislike, noting the waste from exhibitions. They discuss furniture restoration, particularly chairs needing reupholstering, and acknowledge delays in their salon project due to gardening. Anticipation builds for a v...
-
S3E5 Structural Engineer & Builder Wa...
The project at 45 White Oak in Wellesley, Massachusetts showcases significant construction progress. Structural engineer Ben Bulger discusses the impressive size and design of the building, focusing on off-site construction and retaining walls. Key topics include structural compliance, waterproof...
-
S1E17 Full Cost Breakdown