S2E23 Underground Electric | Trenching the FINAL 230ft
Trending Episodes
•
TV-PG
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost line depth. Dry weather affects the digging, and heavy equipment brings back childhood memories. The trench is backfilled with stone dust, and the project awaits the utility company for installation.
Up Next in Trending Episodes
-
S1 E5 Ultimate Bungalow
Master builders recognize the impact of architecture on design. The Gamble House, crafted by Charles and Henry Green, features elements inspired by Japanese architecture and Frank Lloyd Wright. Simplicity in kitchen design reflects historical influences, while regional styles like those in Coloni...
-
S3E10 Start-to-Finish Radiant Floor S...
The installation of radiant floor heating starts with laying Pex tubing beneath the slab, followed by setting up the manifold and boiler for water heating. Rockwool insulation is used for thermal regulation, and the total installation cost is around $2,800. Key techniques for connecting pipes and...
-
Mastering Mortise Locks: Repair and M...
Brent Hole explores the world of home locks, focusing on the durability of mortise locks in pre-1940 houses. He details the lock mechanism and its components, demonstrating how to disassemble, clean, and lubricate these locks. Brent highlights the importance of identifying original hardware and e...