S2E19 Structural Ridge Beam Installation
Trending Episodes
•
TV-PG
The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installed for roof support. The day ends with notable advancements and preparation for the next day's work, hinting at future content on rafter installation.
Up Next in Trending Episodes
-
S2E16 Building Garage Door Headers
The project starts with an introduction to garage door headers, covering necessary materials like two by 12s and insulation, and the use of a skid steer for heavy lifting. It explains the construction process, including dimensions and installation. Challenges with lumber quality and squareness ar...
-
S1E10 Progress Update on Erosion Cont...
Dirt moving is nearly finished, emphasizing erosion control. Grass seed is applied ahead of rain, while rock picking is a major focus, ensuring back safety. Wildlife, especially deer, is present. Seeding faces challenges from rain and hot, humid conditions. After two to three weeks, seed germinat...
-
S2E15 Framing the Second Floor
Explore the essential elements of home construction, starting with mockups and framing details. Key materials like brick and shiplap are highlighted, along with the significance of mockups for client choices. The use of I joists and shear walls ensures structural integrity in floor framing. Stair...