S2E12 Sequencing Wood Veneer
Trending Episodes
•
TV-PG
The kitchen project update highlights the fitting of appliances and the critical role of accurate measurements. Challenges with routing edge poles for the dishwasher are discussed, emphasizing the need for precision in the shop. Hardware installation features a jig for handle mounting. Issues with walnut veneer quality and consistency are addressed, along with plans for supplier communication. A live Q&A segment is proposed to engage viewers.
Up Next in Trending Episodes
-
S2E32 Building Details Come Together
Work continues on the home’s exterior and interior, overcoming challenges from rainy days. The exterior paint is finished, and Boral material is used for construction. Key techniques include tucking aluminum flashing and hand-forming lead around windows. Inside, the mudroom features reclaimed bri...
-
S2E19 Structural Ridge Beam Installation
The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installe...
-
S4E12 Are We Stone Masons Yet?
The project faces initial delays due to rain but resumes as conditions improve. The team learns masonry skills while installing natural stone veneer, focusing on quality control and various techniques. They discuss mortar mixing ratios for optimal strength and workability, create a wooden jig for...