S2E32 Building Details Come Together
Trending Episodes
•
TV-PG
Work continues on the home’s exterior and interior, overcoming challenges from rainy days. The exterior paint is finished, and Boral material is used for construction. Key techniques include tucking aluminum flashing and hand-forming lead around windows. Inside, the mudroom features reclaimed brick tile, while kitchen cabinetry is being installed. A bunk bed is being crafted to match the trim, and air conditioning units are set up to manage humidity.
Up Next in Trending Episodes
-
S2E19 Structural Ridge Beam Installation
The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installe...
-
S4E12 Are We Stone Masons Yet?
The project faces initial delays due to rain but resumes as conditions improve. The team learns masonry skills while installing natural stone veneer, focusing on quality control and various techniques. They discuss mortar mixing ratios for optimal strength and workability, create a wooden jig for...
-
S2E15 Framing the Second Floor
Explore the essential elements of home construction, starting with mockups and framing details. Key materials like brick and shiplap are highlighted, along with the significance of mockups for client choices. The use of I joists and shear walls ensures structural integrity in floor framing. Stair...