Live stream preview
S1E34 Interior Paint Prep (Global)
Trending Episodes
•
14m
Up Next in Trending Episodes
-
S1E15 Framing the Second Floor (Global)
-
S2E14 Air Sealing the Brownstone
The project focuses on installing reclaim beams and blueboard to improve air tightness and ventilation in homes. Reclaimed timbers are used for architectural features, while beam installation ensures structural support. Blueboard is essential for plastering, contributing to air tightness. Blower ...
-
S5E8 Vapour Control Layer Installation
The CIGA system installation focuses on creating a vapor barrier in the upstairs and garage ceiling to prevent moisture issues. It aims for maximum airtightness to enhance heating, cooling, and ventilation efficiency. Key steps include cutting around electrical boxes, using specific taping techni...