    The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...

  • S3E15 Utilizing Every Square Inch

    Millwork installation is underway, with most painting and carpentry completed. A modern mantle piece by John Buckley enhances the space while preserving original features. Efficient storage solutions are implemented in compact areas, with cabinets featuring seamless crown molding. Bathroom modifi...