S2E18 Framing the Floor with I-Joists
Trending Episodes
•
TV-PG
Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-span blocking is added for stability, and sheeting is installed for a flat surface. Future plans include second floor framing.
Up Next in Trending Episodes
-
S3E11 Plastering a Curved Wall
Plastering work focuses on achieving crisp corners and proper ceiling construction. There are delays in window installation, but efforts are underway to replace existing windows. A technical breakdown of radius wall construction emphasizes setup and accuracy. Insights into staircase construction ...
-
S5E10 The Ultimate Painting Tool
Preparation is key before painting, starting with the selection of primer based on cost and quality. Essential tools like extendable poles and specialized rollers are gathered. The area is masked off to prevent mess, and primer quantity is calculated for walls and ceilings. Surfaces are cleaned t...
-
S2E14 Disaster in the Secret Garden!!
Carol takes on the task of cleaning the garage and organizing tiles for the en suite. They explore tile patterns and start the installation, focusing on lighter tiles first. Techniques for cutting tiles are shared, and safety precautions are emphasized. After facing issues with tile adhesive, the...