S2E18 Framing the Floor with I-Joists
Trending Episodes
•
10m
Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-span blocking is added for stability, and sheeting is installed for a flat surface. Future plans include second floor framing.
Up Next in Trending Episodes
-
S3E18 These are NOT your average hose...
The project focuses on installing hot and cold house hydrants, emphasizing their easy installation and frost-free designs. These hydrants are ideal for outdoor kitchens and showers. The assembly process includes detailed drainage and sealing mechanisms, ensuring no leaks. After a month of use, th...
-
S6 E1 Laying Our Chateau's Original 1...
A kitchen design is explored with layout considerations and photos. The focus shifts to flooring installation, emphasizing the use of old materials and the alignment of parquet flooring. An 800-piece puzzle assembly presents challenges with missing pieces. Reflections on the project highlight iss...
-
S1E4 Fighting Groundwater (Global)