S2E18 Framing the Floor with I-Joists
Trending Episodes
•
10m
Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-span blocking is added for stability, and sheeting is installed for a flat surface. Future plans include second floor framing.
Up Next in Trending Episodes
-
S2E16 Building Garage Door Headers
The project starts with an introduction to garage door headers, covering necessary materials like two by 12s and insulation, and the use of a skid steer for heavy lifting. It explains the construction process, including dimensions and installation. Challenges with lumber quality and squareness ar...
-
S2E14 The Ultimate Surprise Proposal
A special proposal unfolds for Elena, featuring a surprise party with friends. The couple embarks on their first adult camping experience, setting up a tent and sharing moments with friends from Michigan. The emotional proposal captures heartfelt love and a marriage request, followed by a celebra...
-
S2E13 Buying $30k in Lumber - Getting...
Mason Dixon Acres introduces Elena and Alex, who share their self-building journey. They focus on the framing process, highlighting the need to purchase materials early due to fluctuating lumber prices. The framing plans include wall specifications and engineered lumber details. They discuss stru...