Live stream preview

Next video will start in 30 seconds

S2E2 Prepping for the Stairs

Close Open

S1E15 Framing the Second Floor

Trending Episodes • 11m

Up Next in Trending Episodes

  • S2E2 Prepping for the Stairs

    The Back Bay project focuses on installing materials and managing moisture for brick, emphasizing the importance of a strong bond and good brick condition. It utilizes stable framing materials like FLS and LVLs. Staircase reinforcement addresses movement and noise, while steel reinforcement meets...

  • S1E7 Transforming a 20-Year-Old Chateau

    In March 2020, a family embarks on a renovation journey after purchasing a chateau that has been empty for two decades. They start with the garden and orchard, envisioning a potting shed or greenhouse. Inside, they uncover historical designs while stripping old wallpaper. Plans include family roo...

  • S1E9 Septic System Update: New Sites ...

    The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service in...