The tasks include preparing flooring, fixing wood damage, and cleaning the garden. Challenges arise from old materials, such as missing pieces and woodworm. Garden maintenance focuses on ivy removal and wall repairs. An exploration of an old farmhouse reveals its structural elements and potential uses. The process of creating molds for repairs highlights the importance of symmetry and proper gluing techniques, showcasing a blend of restoration and maintenance efforts.
Up Next in Trending Episodes
-
S3E20 Framing Lifting Staircase Solo ...
Stair construction experiences an eight-month delay as other tasks take priority. The builder uses stringers, measuring rise and tread accurately with tools like stair gauges and a framing square. A mock-up ensures proper fit, and stringers are cut with precision. Installation addresses challenge...
-
S1E28 Using the Right Siding
The construction project moves forward with completed interior plastering and the installation of beams and trusses. The focus now shifts to the exterior design, featuring elliptical archways and custom doors. Site protection measures are in place, and effective water management systems are estab...
-
S1E9 Septic System Update: New Sites ...
The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service in...