    Day three highlights the installation of rafters and wall construction. The kitchen is designed with large windows for natural light. The roof design considers slant and space for aesthetic appeal. Framing tasks involve checking window openings and ensuring carpentry standards. Material procureme...

  • S2E18 Framing the Floor with I-Joists

    Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-s...

  • S2E16 Building Garage Door Headers

    The project starts with an introduction to garage door headers, covering necessary materials like two by 12s and insulation, and the use of a skid steer for heavy lifting. It explains the construction process, including dimensions and installation. Challenges with lumber quality and squareness ar...