S2E11 The Slab Pour was a Disappointment
Trending Episodes
•
TV-PG
Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key lessons include the importance of vetting contractors. The project then moves to framing, with plans for self-framing the first floor and hiring professionals for the second floor and roofing.
Up Next in Trending Episodes
-
S3E13 Trim and Crown Moulding
A renovation project in Back Bay includes the installation of a new door and ongoing carpentry work. The team integrates traditional and modern design, focusing on trim details and specific molding techniques. They plan the sequence of installation carefully, preferring to paint before flooring. ...
-
S1 E6 Recreating the English Tavern
A secret tavern is being built in a 1920s house by John Staub. The basement is transformed with oak paneling from a historic library and a fireplace featuring Tudor and Jacobian carvings. Techniques like mason miters and fuming enhance the woodwork. The ceiling showcases a beam hierarchy for an o...
-
S1E17 Can you see the difference?
The process covers decisions on wallpapering and flooring, emphasizing linseed oil for protection. Bathroom renovations include a color change and a feature wall, with a shift to varnishing the floor. Insulation installation is planned for colder weather. Challenges with paint removal create frus...