Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key lessons include the importance of vetting contractors. The project then moves to framing, with plans for self-framing the first floor and hiring professionals for the second floor and roofing.
Up Next in Trending Episodes
-
S2E30 Powering Our Tools
Home building faces challenges such as delays in 400 amp service and equipment issues. Temporary power setups, including spider boxes, are used during construction. The industry is shifting towards cordless tools, with new cordless miter saws and vacuums improving efficiency. Bluetooth technology...
-
S2E34 Interior Paint Prep
The renovation project shows significant progress with completed exterior painting and chimney pot installation. The second floor is being prepped for paint, and two fireplaces are installed. Landscaping transitions are in progress, and electrical updates provide a permanent power switch. The HVA...
-
S1E6 Recreating the English Tavern
A secret tavern is being built in a 1920s house by John Staub. The basement is transformed with oak paneling from a historic library and a fireplace featuring Tudor and Jacobian carvings. Techniques like mason miters and fuming enhance the woodwork. The ceiling showcases a beam hierarchy for an o...