S2E11 The Slab Pour was a Disappointment
Trending Episodes
•
19m
Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key lessons include the importance of vetting contractors. The project then moves to framing, with plans for self-framing the first floor and hiring professionals for the second floor and roofing.
Up Next in Trending Episodes
-
S2E10 Radiant Heat Tubing in Slab (in...
Concrete installation starts with preparing PEX tubing, which is secured to rebar and the slab. A DIY coiler simplifies uncoiling. PEX A tubing is selected for its flexibility. The Loop CAD program helps design the circuit layout, addressing challenges in tubing placement. Proper positioning enha...
-
S2E9 Slab Prep for Radiant Heat
Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installe...
-
S2E8 Backfilling, Leveling, and Compa...
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...