S3E2 Prepping for the Stairs
New Episodes
•
TV-PG
The Back Bay project focuses on installing materials and managing moisture for brick, emphasizing the importance of a strong bond and good brick condition. It utilizes stable framing materials like FLS and LVLs. Staircase reinforcement addresses movement and noise, while steel reinforcement meets structural code requirements. Existing plumbing and walls present challenges that require innovative solutions. Upcoming steps involve installing steel to maintain structural integrity in compliance with regulations.
Up Next in New Episodes
-
S2E9 Slab Prep for Radiant Heat
Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installe...
-
S1E22 Building Footing Forms and Batt...
The project kicks off with enthusiasm but faces challenges from rain affecting construction. A swimming pool is found, leading to necessary adjustments. After cleaning the trench, water and electric line sleeves are installed, and footing forms are set up with horizontal and vertical rebar for su...
-
S2E16 Building Garage Door Headers
The project starts with an introduction to garage door headers, covering necessary materials like two by 12s and insulation, and the use of a skid steer for heavy lifting. It explains the construction process, including dimensions and installation. Challenges with lumber quality and squareness ar...