S2E9 Slab Prep for Radiant Heat
New Episodes
•
TV-PG
Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installed for stability. Final preparations include laying radiant tubing and form boards before pouring the concrete slab.
Up Next in New Episodes
-
S3E23 The Next Big Project
Sanding surfaces and tracing details for moldings is the initial step, followed by assessing panel conditions and discussing repair plans. Various painting techniques, such as gold leafing and pearl paint, are explored for detailing. Updates on the vegetable garden highlight large onions and pota...
-
S2E3 New Years at Chateau de la Ferté
The event kicks off with New Year greetings and a birthday task where participants build a teepee from canes. Team building activities are promoted, and the birthday celebration features cake and warm wishes. Fireworks light up the sky for the birthday, attracting an unexpected police presence, b...
-
S4E15 Remodeling our New Build.. Alre...
A series of interior framing projects are detailed, starting with modifications to a laundry nook for appliance accommodation. A storage platform is built above the laundry machines. In the bedroom closet, niches are created for shoe organization. The pantry door is reframed for a pocket door, an...