S1E22 Building Footing Forms and Battling Weather
New Episodes
•
TV-PG
The project kicks off with enthusiasm but faces challenges from rain affecting construction. A swimming pool is found, leading to necessary adjustments. After cleaning the trench, water and electric line sleeves are installed, and footing forms are set up with horizontal and vertical rebar for support. A funny moment arises with a misplaced porta-potty. Plans to pour concrete depend on the weather, and the project wraps up with thanks to a sponsor and viewers.
Up Next in New Episodes
-
S1E1 We are building instead of buying!
Alex and Elaina are in their mid-twenties and embark on a journey to build a debt-free home while seeking financial independence. They face challenges in the traditional home market and explore alternatives like house hacking. Ultimately, they choose to buy land and construct their own home, focu...
-
S1E6 Inside Look at Kitchen Cabinet I...
The process starts with cabinet installation, setting control points, and measuring countertop heights while adjusting for rivets. Unique design features include under-counter appliances and a divider between the refrigerator and freezer, optimizing space. Stability is achieved by installing shel...
-
S1E8 How detailed are your cabinet dr...
The episode introduces updates on various projects, focusing on floating vanities with hidden plumbing for space efficiency. It details the construction of back panels, a window bench project, and the countertop assembly process. An entryway cabinet design with adjustable shelves is presented, al...