S1E22 Building Footing Forms and Battling Weather
New Episodes
•
18m
The project kicks off with enthusiasm but faces challenges from rain affecting construction. A swimming pool is found, leading to necessary adjustments. After cleaning the trench, water and electric line sleeves are installed, and footing forms are set up with horizontal and vertical rebar for support. A funny moment arises with a misplaced porta-potty. Plans to pour concrete depend on the weather, and the project wraps up with thanks to a sponsor and viewers.
Up Next in New Episodes
-
S2E12 Sequencing Wood Veneer
The kitchen project update highlights the fitting of appliances and the critical role of accurate measurements. Challenges with routing edge poles for the dishwasher are discussed, emphasizing the need for precision in the shop. Hardware installation features a jig for handle mounting. Issues wit...
-
S1E8 Getting Ready to Sell the Old House
Lauren and David share their journey renovating The Meadow for their large family, using the home as both a sanctuary and a design laboratory. Flooring decisions test their resolve, while plans for a wildflower meadow reflect their passion for nature. As spring nears, they ready their current hou...
-
S1E29 Interior Carpentry Progress
The project showcases significant advancements in interior carpentry, featuring unique profiles from Cuban Brothers and efficient V groove paneling. Crown molding adds a distinctive touch, while electrical service installation and the development of spaces like a library and office highlight atte...