S1E22 Building Footing Forms and Battling Weather
New Episodes
•
TV-PG
The project kicks off with enthusiasm but faces challenges from rain affecting construction. A swimming pool is found, leading to necessary adjustments. After cleaning the trench, water and electric line sleeves are installed, and footing forms are set up with horizontal and vertical rebar for support. A funny moment arises with a misplaced porta-potty. Plans to pour concrete depend on the weather, and the project wraps up with thanks to a sponsor and viewers.
Up Next in New Episodes
-
S1E5 What is Period Revival Architect...
The content explores architectural styles from the period revival era, focusing on 1920 to 1940. It highlights the impact of European architecture on American designs post-World War I, covering various revivals like colonial and Tudor. Key architectural details such as timbering and window styles...
-
S2E14 Air Sealing the Brownstone
The project focuses on installing reclaim beams and blueboard to improve air tightness and ventilation in homes. Reclaimed timbers are used for architectural features, while beam installation ensures structural support. Blueboard is essential for plastering, contributing to air tightness. Blower ...
-
S2E13 A Sudden House Emergency Tests ...
As construction at the Meadow winds down and spring settles in, an unexpected water leak interrupts the calm and demands immediate attention. Drying efforts move quickly as bathroom flooding reveals the reality of life in a newly finished home. Between foraging walks, garden planning with low-mai...