S2E10 Cleaning the Chateau with Toothbrushes
New Episodes
•
TV-PG
Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, using an improvised toothbrush, while managing dust from plaster removal is a concern. Wall removal is also necessary to ensure a level and square structure for tiling.
Up Next in New Episodes
-
S1E7 A Mid-Construction Tour Filled W...
Lauren and David invite viewers into a mid-construction tour where practical updates meet imaginative design. A witchy room, hobbit door, hidden library, and a playroom with a dungeon-style entrance add storybook charm to the evolving layout. As windows, doors, and the new mudroom come together, ...