S2E10 Cleaning the Chateau with Toothbrushes
New Episodes
•
TV-PG
Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, using an improvised toothbrush, while managing dust from plaster removal is a concern. Wall removal is also necessary to ensure a level and square structure for tiling.
Up Next in New Episodes
-
S2 E2: The Ranch Project - Classical ...
The Ranch Project showcases updates on organization and framing, inspired by UK landscapes and historic homes. It aims to create a welcoming entry experience with views of the house, referencing Monticello for garden organization. The design features changing entry points, pavilions, and a purpos...
-
S1E2 Fence Building
Lauren introduces a vegetable garden project aimed at involving children in gardening activities. The garden layout features specific dimensions and comfortable walkways. The family digs holes for fence posts and levels them with concrete. Kids participate in assembling raised garden beds, design...
-
S1E13 Framing with KD vs Engineered L...