Live stream preview

Next video will start in 30 seconds

S1E16 Curved exterior moulding

Close Open

S3E11 Surveying Fire Destruction

TV-PG rating icon
New Episodes

Up Next in New Episodes

  • S1E16 Curved exterior moulding

    The episode covers the entryway installation process, starting with the removal of the old structure. It addresses corbel issues, including insect damage and rot. Piloters are installed using scribing techniques, and rot-resistant wood is utilized for durability. New electrical boxes are added, a...

  • S1E7 The Benefits of Rainscreen Cladd...

    Explore the cladding detail of a house, focusing on masonry products and expanded rain screens. It covers the wall structure, including a two by six wall with sheathing and a weather-resistant barrier. The installation process highlights Rockwell mineral wool insulation and structural support. Ke...

  • S3E12 Pouring a Small Concrete Slab f...

    The project starts with installing an HVAC system for both upstairs and downstairs. A concrete slab is prepared for outdoor units, with careful attention to dimensions and securing methods. A concrete mixer is used to achieve the right consistency for the pour. Challenges during pouring include t...