Live stream preview

Next video will start in 30 seconds

S2E8 Backfilling, Leveling, and Compacting Gravel under Slab

Close Open

S3E2 Metal Garage Door Trim | Install & Details

Trending Episodes

Up Next in Trending Episodes

  • S2E8 Backfilling, Leveling, and Compa...

    The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...

  • S1E14 Bathroom Renovation Update: Pro...

    Work on the bathroom continues with wall preparation and plumbing layout. The team encounters challenges related to waste management and flooring choices. Electrical work starts in the en suite, but progress is hindered by illness. Viewer feedback on flooring options is sought, highlighting the s...

  • S3E6 U-Shaped Stairs Template

    The project tackles issues with the steam heating system, focusing on insulation and efficiency. It details the design and construction of a U-shaped staircase, highlighting fabrication and fitting. The existing roof deck is evaluated for missing boards and leaks. Plans for electrical upgrades in...