S1E22 Building Footing Forms and Battling Weather
Trending Episodes
•
18m
The project kicks off with enthusiasm but faces challenges from rain affecting construction. A swimming pool is found, leading to necessary adjustments. After cleaning the trench, water and electric line sleeves are installed, and footing forms are set up with horizontal and vertical rebar for support. A funny moment arises with a misplaced porta-potty. Plans to pour concrete depend on the weather, and the project wraps up with thanks to a sponsor and viewers.
Up Next in Trending Episodes
-
S4E7 Flashing 101: How to Stop Water ...
Flashing plays a vital role in construction by preventing water damage. Roof overhangs shield walls, while window installations require proper sill flashing and sealing. Exterior trim needs careful flashing to direct water flow, and mechanical penetrations like vents have specific flashing method...
-
S4E12 Are We Stone Masons Yet?
The project faces initial delays due to rain but resumes as conditions improve. The team learns masonry skills while installing natural stone veneer, focusing on quality control and various techniques. They discuss mortar mixing ratios for optimal strength and workability, create a wooden jig for...
-
S1E9 Septic System Update: New Sites ...
The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service in...