S1E22 Building Footing Forms and Battling Weather
Trending Episodes
•
18m
The project kicks off with enthusiasm but faces challenges from rain affecting construction. A swimming pool is found, leading to necessary adjustments. After cleaning the trench, water and electric line sleeves are installed, and footing forms are set up with horizontal and vertical rebar for support. A funny moment arises with a misplaced porta-potty. Plans to pour concrete depend on the weather, and the project wraps up with thanks to a sponsor and viewers.
Up Next in Trending Episodes
-
S1E10 Progress Update on Erosion Cont...
Dirt moving is nearly finished, emphasizing erosion control. Grass seed is applied ahead of rain, while rock picking is a major focus, ensuring back safety. Wildlife, especially deer, is present. Seeding faces challenges from rain and hot, humid conditions. After two to three weeks, seed germinat...
-
S3E13 Ductless Install & Start Up
The installation of Mr Cool ductless HVAC systems for garages and living spaces is detailed, starting with an overview of the products and planning phase. Key steps include preparing a concrete slab, using software for layout design, and highlighting the benefits of ductless systems like energy e...
-
S1E4 Transforming the Property
A couple embarks on a renovation journey in Wales, tackling challenges like weather and a large stump. They build a rain shelter and parking bay while enhancing their garden. As they gather materials and discuss future projects, they explore a barn, assessing its potential. The week ends on a pos...