S3E17 Transforming a Messy Space: Cleaning and Repairs
Trending Episodes
•
TV-PG
Job completion often leaves a mess that requires cleaning. The condition of the floor joists under the salon is assessed, with some being rotten. Good wood is saved for winter use. Plans include installing a vapor barrier and considering electric point placements. Terry is tasked with digging up new plants, and tall bamboo is sought for strawberry cages. The strawberry bed structure is reinforced against birds, and a split tap is repaired using silicone.
Up Next in Trending Episodes
-
S5E8 Vapour Control Layer Installation
The CIGA system installation focuses on creating a vapor barrier in the upstairs and garage ceiling to prevent moisture issues. It aims for maximum airtightness to enhance heating, cooling, and ventilation efficiency. Key steps include cutting around electrical boxes, using specific taping techni...
-
S1E16 Curved exterior moulding
The episode covers the entryway installation process, starting with the removal of the old structure. It addresses corbel issues, including insect damage and rot. Piloters are installed using scribing techniques, and rot-resistant wood is utilized for durability. New electrical boxes are added, a...
-
S1E35 Solid Hemlock Beams (Global)