S3E17 Transforming a Messy Space: Cleaning and Repairs
Trending Episodes
•
TV-PG
Job completion often leaves a mess that requires cleaning. The condition of the floor joists under the salon is assessed, with some being rotten. Good wood is saved for winter use. Plans include installing a vapor barrier and considering electric point placements. Terry is tasked with digging up new plants, and tall bamboo is sought for strawberry cages. The strawberry bed structure is reinforced against birds, and a split tap is repaired using silicone.
Up Next in Trending Episodes
-
S3E4 The Chateau Upgrades
Adrian encounters difficulties with the toilet door due to hinge and frame problems. As preparations for painting begin, discussions on techniques and paint types take place. Renovation reveals dampness and rough plaster, leading to the need for a dehumidifier. Choices for the salon's decor empha...
-
S3E12 Inside the Busy Salon: Construc...
The salon environment is bustling with activity as tasks are prioritized, leading to some jobs being left unfinished. Ongoing work includes the chimney and fireplace, with preparations for concrete delivery. Heavy blocks pose challenges for movement. Construction in the cellar sees walls being bu...
-
S1E13 Our 18 Month Timelapse