S3E12 Inside the Busy Salon: Construction and Challenges
Trending Episodes
•
17m
The salon environment is bustling with activity as tasks are prioritized, leading to some jobs being left unfinished. Ongoing work includes the chimney and fireplace, with preparations for concrete delivery. Heavy blocks pose challenges for movement. Construction in the cellar sees walls being built and concrete laid, while floor repairs focus on beam conditions. Plans are underway to level joists for better flooring support.
Up Next in Trending Episodes
-
S3E11 Walking through a big walnut cl...
-
S3E2 After the kitchen reno
A kitchen renovation project begins with the need for updates in an outdated space. Safety measures are implemented to remove old appliances and cabinets. The wall is reframed for cabinetry height, and new electrical wiring and plumbing adjustments are made. Challenges like sloping floors are lev...
-
S3E8 Preparing for Renovations and Gu...
The process includes proper storage of materials, workspace organization, and renovation preparations. A temporary floor is created for safety while existing structure issues are addressed. Household chores are managed alongside guest preparations, including plumbing work and cleaning. Outdoor ta...