Live stream preview
S3E12 Inside the Busy Salon: Construction and Challenges
Trending Episodes
•
TV-PG
The salon environment is bustling with activity as tasks are prioritized, leading to some jobs being left unfinished. Ongoing work includes the chimney and fireplace, with preparations for concrete delivery. Heavy blocks pose challenges for movement. Construction in the cellar sees walls being built and concrete laid, while floor repairs focus on beam conditions. Plans are underway to level joists for better flooring support.
Up Next in Trending Episodes
-
S3E5 Slip matching rift white oak veneer
Explore a kitchen project that highlights veneering techniques with Rift White Oak and the barber pole effect. The design focuses on a U-shaped kitchen tailored to client needs, maximizing space. Custom cabinetry fabrication is detailed, featuring pullouts and micro shaker panels. The assembly pr...
-
S1E2 New Build Site Prep (Global)
-
S1E1 New Build Around an Ancient Tree...