Live stream preview

Next video will start in 30 seconds

S2E10 Cleaning the Chateau with Toothbrushes

Close Open

S3E16 Pressure Testing Our Drain-Waste-Vent Pipes

Trending Episodes • 14m

Up Next in Trending Episodes

  • S2E10 Cleaning the Chateau with Tooth...

    Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...

  • S3E1 Hammering Through 12 Feet Of Ledge

    The project showcases 45 white oak residents and emphasizes redefining builder grade through site work. It discusses the demolition of an existing home, collaboration with the fire department, and challenges from site elevation and ledge. Excavation impacts costs but reinforces design commitment....

  • S1E36 Two Home Offices

    The design of two home offices in the Needham project features a separate entrance for visitor access. Natural light floods the spaces through full glass and double height windows. A green monochromatic color scheme and salvaged wood beams create a cohesive look. Two fireplaces, one gas and one w...