S1E9 Building Polytunnel Our First Tunnels 40Ft Completed Ready
Trending Episodes
•
TV-PG
Up Next in Trending Episodes
-
S1E23 Pouring Concrete Footings
Water management presents challenges during construction as significant accumulation occurs in the footing despite tarp efforts. Preparations for the concrete pour involve scheduling the truck and confirming neighbor assistance. Rebar installation emphasizes safety with caps and wire chairs. The ...
-
S2E10 Cleaning the Chateau with Tooth...
Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...
-
S2E7 Walls to Wiring
The project includes painting and varnishing surfaces, preparing for wallpapering, and tackling sanding challenges. It also covers electrical work, such as isolating and replacing outdated wiring. Budgeting for chandeliers and finding unique items in shops are discussed. The toilet renovation inv...