S3E11 Heated Slab Tests
Trending Episodes
•
TV-PG
The radiant heating system installation requires careful coordination among various trades and thorough preparation. After extensive work, the system is filled with water and tested. Initial leaks lead to adjustments, and once the boiler and pump are activated, flow and temperature are monitored. A post-installation review uncovers a slow leak, but overall, the system operates well. Future updates will address energy usage and performance.
Up Next in Trending Episodes
-
S4E21 406 Days Living
A couple shares their experience of living in a 2006 RV for over a year while building their house. They discuss the excitement and challenges of RV life, including harsh winters, limited space, and maintenance issues. They manage laundry and cooking creatively, face heating costs, and deal with ...
-
S1E33 Millwork Details (Global)
-
S1E5 Making Curved moulding
This episode showcases a new format and enhanced video quality while demonstrating the creation of a curved crown. It covers the steps of removing the existing crown, cutting layers, and assembling them with polyurethane glue for durability. The molder is set up for precise profile cuts, and the ...