S1E29 Interior Carpentry Progress (Global)
Trending Episodes
•
13m
Up Next in Trending Episodes
-
S3E15 Festival Preparations and Ongoi...
Preparations for a festival involve setup and addressing noise concerns. Work at the Chateau includes mold making and spray application, while flooring progress focuses on installing joists for safety. A gift from Valeria, a water bottle for the pool, adds excitement. Skirting board installation ...
-
S2E12 Concrete Slab Cost
Explore the costs involved in building a slab foundation, including a detailed budget tracking system. Key expenses range from excavation to materials, with bartering used to save on excavation costs. Significant labor and material costs are outlined, totaling just under $25,000. Tools for the pr...
-
S2E6 Gutter Downspout Drains & Backfi...
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth...