S2E8 Backfilling, Leveling, and Compacting Gravel under Slab
Trending Episodes
•
12m
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent slab height. A plate compactor stabilizes the surface to prevent cracking. Finally, insulation board, vapor barrier, and rebar grid are set up before pouring concrete.
Up Next in Trending Episodes
-
S2E6 Gutter Downspout Drains & Backfi...
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth...
-
S2E23 Underground Electric | Trenchin...
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...
-
S3E1 Main Electrical Service Panel In...
A rainy day sets the stage for installing a 200 amp main electric service panel. The process includes setting up the panel, installing conduit, and following NEC code for guidance. A heat gun bends the conduit, and ground wire is connected. Wiring connections are made, including neutral and hot w...