Live stream preview

Next video will start in 30 seconds

S2E23 Underground Electric | Trenching the FINAL 230ft

Close Open

S2E6 Gutter Downspout Drains & Backfilling Foundation!

Trending Episodes • 11m

Up Next in Trending Episodes

  • S2E23 Underground Electric | Trenchin...

    The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...

  • S3E1 Main Electrical Service Panel In...

    A rainy day sets the stage for installing a 200 amp main electric service panel. The process includes setting up the panel, installing conduit, and following NEC code for guidance. A heat gun bends the conduit, and ground wire is connected. Wiring connections are made, including neutral and hot w...

  • S3E12 Pouring a Small Concrete Slab f...

    The project starts with installing an HVAC system for both upstairs and downstairs. A concrete slab is prepared for outdoor units, with careful attention to dimensions and securing methods. A concrete mixer is used to achieve the right consistency for the pour. Challenges during pouring include t...