S2E6 Gutter Downspout Drains & Backfilling Foundation!
Trending Episodes
•
11m
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth bomber is spotted overhead. Gravel provides stability beneath the pipes, and preparations for slab installation are in progress as rain threatens to delay work.
Up Next in Trending Episodes
-
S2E23 Underground Electric | Trenchin...
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...
-
S3E1 Main Electrical Service Panel In...
A rainy day sets the stage for installing a 200 amp main electric service panel. The process includes setting up the panel, installing conduit, and following NEC code for guidance. A heat gun bends the conduit, and ground wire is connected. Wiring connections are made, including neutral and hot w...
-
S3E12 Pouring a Small Concrete Slab f...
The project starts with installing an HVAC system for both upstairs and downstairs. A concrete slab is prepared for outdoor units, with careful attention to dimensions and securing methods. A concrete mixer is used to achieve the right consistency for the pour. Challenges during pouring include t...