S2E2 Prepping for the Stairs
Trending Episodes
•
11m
The Back Bay project focuses on installing materials and managing moisture for brick, emphasizing the importance of a strong bond and good brick condition. It utilizes stable framing materials like FLS and LVLs. Staircase reinforcement addresses movement and noise, while steel reinforcement meets structural code requirements. Existing plumbing and walls present challenges that require innovative solutions. Upcoming steps involve installing steel to maintain structural integrity in compliance with regulations.
Up Next in Trending Episodes
-
S3E10 Start-to-Finish Radiant Floor S...
The installation of radiant floor heating starts with laying Pex tubing beneath the slab, followed by setting up the manifold and boiler for water heating. Rockwool insulation is used for thermal regulation, and the total installation cost is around $2,800. Key techniques for connecting pipes and...
-
S3E2 This House Was Framed In A Shop
The Cape Cod Panel project showcases a meticulous approach to framing and construction. The team prepares materials and highlights the advantages of panelization in a controlled setting. They tackle structural challenges and stress the need for pre-field modeling to ensure alignment of architectu...
-
S2E12 Our New Arrivals!
Goslings bring excitement as the family considers names like Snow Drop and Primrose. They involve children in planting flowers while caring for the growing goslings. Amidst this, the family plans renovations for their new beach house, balancing the challenges of raising goslings with preparations...