Live stream preview

Next video will start in 30 seconds

S1E9 Septic System Update: New Sites and Progress

Close Open

S3E22 Starting The Exterior Flashing Furring Strips Save Yourself

Trending Episodes

Up Next in Trending Episodes

  • S1E9 Septic System Update: New Sites ...

    The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service in...

  • S4E19 Ducting Bath Garage Vent Fans

    The project focuses on installing duct work and managing moisture through various systems. Bath fans are integrated with the main duct work and a whole house dehumidifier. Modifications to the ceiling include a soffit design for the fan vent. Hard pipe duct materials are chosen for durability. A ...

  • S4E20 How to Screw Up a 300ft French ...

    A water problem leads to outdoor projects aimed at enhancing the yard before a wedding. Drainage issues are addressed through the installation of a French drain, utilizing non-woven geotextile fabric and specialized drainage pipe. The process includes installing a catch basin, adapting for variou...