Live stream preview

Next video will start in 30 seconds

S1E8 Demolition Chaos as Ceilings Come Down and Plans Take Shape

Close Open

S2E12 New Arrivals Bring Life, Laughter, and a Busy Season Ahead

Trending Episodes • 33m

Up Next in Trending Episodes

  • S1E8 Demolition Chaos as Ceilings Com...

    Demolition ramps up as Gavin and Nicole strip ceilings and walls back to expose the true condition of their Welsh smallholding. Damp issues and poor past work come to light, reinforcing the need for breathable materials and proper structural upgrades. As usable materials are salvaged and waste is...

  • S1E10 New Driveway Begins

    The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...

  • S1E14 Understanding Structural Detail...

    The project introduces structural detail walls, defining shear walls and their role in construction. It discusses the first floor layout, including design surprises and wall framing details with plywood for strength. The installation of a continuous vapor retarder is highlighted for improved perf...