Live stream preview

Next video will start in 30 seconds

S2E6 46 Corner Footing

Close Open

S2E7 Rebar Ready

Trending Episodes

Up Next in Trending Episodes

  • S2E6 46 Corner Footing

    Construction is advancing with the placement of concrete for phase one footings and the installation of vertical rebar. Three concrete trucks and a pump are on site. Preparations for waterproofing and drainage systems are underway. A meeting with Seagate addresses air sealing strategies and desig...

  • S1E6 Transforming a 1940s Home: The P...

    The Parkside project highlights the renovation of a 1940s home, merging mid-century and contemporary designs. The team provides a comprehensive service, overseeing everything from design to execution. Key features include a welcoming entrance, a casual living room, a functional kitchen, and a sty...

  • S2E3 Planting

    Creating a garden involves selecting plants, preparing soil, and engaging children in the process. The excitement of planting is emphasized, along with the significance of balance and symmetry in layout. Soil preparation includes cleaning beds and discussing compost types. Gardening with kids bui...