Live stream preview

Next video will start in 30 seconds

S1E9 Septic System Update: New Sites and Progress

Close Open

S2 E3: The Ranch Project— the Coolest Stair Treads We've Built

Trending Episodes

Up Next in Trending Episodes

  • S1E9 Septic System Update: New Sites ...

    The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service in...

  • S3E2 Prepping for the Stairs

    The Back Bay project focuses on installing materials and managing moisture for brick, emphasizing the importance of a strong bond and good brick condition. It utilizes stable framing materials like FLS and LVLs. Staircase reinforcement addresses movement and noise, while steel reinforcement meets...

  • S4E19 Ducting Bath Garage Vent Fans

    The project focuses on installing duct work and managing moisture through various systems. Bath fans are integrated with the main duct work and a whole house dehumidifier. Modifications to the ceiling include a soffit design for the fan vent. Hard pipe duct materials are chosen for durability. A ...