S2E34 Interior Paint Prep
Trending Episodes
•
TV-PG
The renovation project shows significant progress with completed exterior painting and chimney pot installation. The second floor is being prepped for paint, and two fireplaces are installed. Landscaping transitions are in progress, and electrical updates provide a permanent power switch. The HVAC system is enhanced for fresh air circulation. Kitchen cabinetry installation features a coffee station, and protective measures are in place to prevent damage during construction.
Up Next in Trending Episodes
-
S3E13 Trim and Crown Moulding
A renovation project in Back Bay includes the installation of a new door and ongoing carpentry work. The team integrates traditional and modern design, focusing on trim details and specific molding techniques. They plan the sequence of installation carefully, preferring to paint before flooring. ...
-
S2E28 Using the Right Siding
The construction project moves forward with completed interior plastering and the installation of beams and trusses. The focus now shifts to the exterior design, featuring elliptical archways and custom doors. Site protection measures are in place, and effective water management systems are estab...
-
S2E21 Window Installation
Significant progress is made on the roof installation, with the roof framing completed and window installations underway. The team focuses on selecting synthetic slate materials for an authentic look and addresses the complexities of curved valleys. Proper framing and drainage are emphasized in t...