S1E9 Septic System Update: New Sites and Progress
Trending Episodes
•
6m 28s
The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service installation is ongoing, and design work for the year is underway. A new website is launched to enhance content organization and viewer engagement.
Up Next in Trending Episodes
-
S3E13 The Beginning of a Long Journey
A bright Monday morning features an update on a YouTube channel managed by Bethany, who compiles videos sent via email. Some videos were missed due to corrupt emails, but Tony's assistance with block work simplifies the process. Construction progress includes discussions on block heights and futu...
-
S3E3 Modern meets rustic vanity
A custom vanity project showcases the fabrication process and key features. Full-sized samples are made for client approval, enabling design modifications. The design features a shaker-style door crafted from white oak, with multiple color options for the homeowner. After incorporating feedback, ...
-
S2E6 Gutter Downspout Drains & Backfi...
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth...