S1E9 Septic System Update: New Sites and Progress
Trending Episodes
•
TV-PG
The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service installation is ongoing, and design work for the year is underway. A new website is launched to enhance content organization and viewer engagement.
Up Next in Trending Episodes
-
S1E14 Hiding cabinet screws
Space constraints challenge the shop while managing multiple projects. Recent decluttering efforts support ongoing work. Preferences for cabinet hardware highlight the benefits of magic corners and trash units. Techniques for cabinet installation focus on hinge mounting and blocking for stability...
-
S2E7 Walls to Wiring
The project includes painting and varnishing surfaces, preparing for wallpapering, and tackling sanding challenges. It also covers electrical work, such as isolating and replacing outdated wiring. Budgeting for chandeliers and finding unique items in shops are discussed. The toilet renovation inv...
-
S2E36 Two Home Offices
The design of two home offices in the Needham project features a separate entrance for visitor access. Natural light floods the spaces through full glass and double height windows. A green monochromatic color scheme and salvaged wood beams create a cohesive look. Two fireplaces, one gas and one w...