Live stream preview

Next video will start in 30 seconds

S1E10 New Driveway Begins

Close Open

S1E8 Insulating the Foundation

Trending Episodes • 10m

Up Next in Trending Episodes

  • S1E10 New Driveway Begins

    The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...

  • S2E8 The House Experiment

    Carmichael Construction completes a project with impressive speed, transforming a house into a design laboratory. Temporary furniture and decor are arranged for a photo shoot, while landscaping efforts focus on planting selected flora. The project aims to create a wildlife-friendly environment, e...

  • S1E14 Understanding Structural Detail...

    The project introduces structural detail walls, defining shear walls and their role in construction. It discusses the first floor layout, including design surprises and wall framing details with plywood for strength. The installation of a continuous vapor retarder is highlighted for improved perf...