S1E7 Day Two of Cleanup: Preparing for Excavation
Trending Episodes
•
12m
Cleanup work continues on day two, focusing on removing tree tops and stumps for excavation. The team faces challenges with brush cleaning, prompting a reconsideration of chipping. They clear a path for firewood and use effective fire starters. Favorable weather aids their efforts, and a skid steer with a root grapple improves efficiency. Future plans include stump removal, driveway installation, and a septic test to establish a home site.
Up Next in Trending Episodes
-
S1E21 Window Installation
Significant progress is made on the roof installation, with the roof framing completed and window installations underway. The team focuses on selecting synthetic slate materials for an authentic look and addresses the complexities of curved valleys. Proper framing and drainage are emphasized in t...
-
S3E11 This Brick Siding Took Hundreds...
The Void Oak project showcases a unique Peterson cover brick cladding that highlights modern design and craftsmanship. It includes waterproofing layers, a rain screen system, and heavy gauge metal screens for insect protection. The installation process emphasizes durability and ease, with specifi...
-
S1E34 Interior Paint Prep
The renovation project shows significant progress with completed exterior painting and chimney pot installation. The second floor is being prepped for paint, and two fireplaces are installed. Landscaping transitions are in progress, and electrical updates provide a permanent power switch. The HVA...